Search This Blog

Showing posts with label commuter. Show all posts
Showing posts with label commuter. Show all posts

Tuesday, August 9, 2011

FROM WALLINGFORD - Truth overtakes rail project

V-Knight_S

This week’s FROM WALLINGFORD was written by Stephen Knight

As published in the Record Journal, Sunday August 7, 2011

I have been a student of the railroad industry for my entire adult life; as a student in graduate school, as a keenly interested observer, and as a professional transportation consultant. So I write this column with considerable angst, because it is my conclusion that the proposed New Haven-Hartford-Springfield commuter rail project that will run through Wallingford is a boondoggle of fantastic proportions. My inherent predisposition to support this project is overwhelmed when confronted with the 1) downright mythical speed and service projections, 2) wildly optimistic ridership projections and 3) blindly underestimated capital and operating expenses.

Speed and service projections: In a May 9 press release, Gov. Malloy stated that these trains would reach “speeds up to 110 miles per hour.” I say: only if you catapult the trains from every station like they do jet fighters off an aircraft carrier. Why? First of all, there will eventually be 11 stops in the 62 miles between New Haven and Springfield. That’s an average of less than six miles between stops. So where exactly will these trains do 110 mph? And — are you ready for this? — the service will commence with hand-me-down equipment from Shoreline East. According to their latest schedule, those trains, making all the stops, move between New Haven and New London averaging less than 50 mph, and do so on the most advanced, best maintained railroad track in America. Secondly, this speed in a corridor with thirty-eight grade crossings? Really? So calling the NHHS project high speed rail is utterly fictitious.

Ridership projections built on the sentiment “Build it and they will come”: in calculating potential ridership, the numbers presented assume a) many more daily Amtrak trains running on the line; b) enormous numbers of passengers feeding the line from the so-called “Knowledge Corridor” line in central Massachusetts which has yet to be rebuilt; and c) thousands upon thousands of people willing to live in this corridor and work 2 ½ hours away in New York City. In other words, the number of commuters between New Haven and Springfield that is supposedly the driving force behind this project could never, ever justify the price tag, so numbers assuming a complete northeastern United States rail system build out are used to puff up the stats.

Capital and operating expenses: The price tag for rail line and station construction alone is $647 million, and the project is counting on huge support from the feds. Here is the latest fed response: State of Connecticut request — $227 million. Fed grant: $30 million. Result: the project has already contracted to providing trains only during peak commuter times. And how much money is allocated to purchase rolling stock — the stuff you ride on? Zero. As mentioned above, the plan is to use the existing Shore Line East equipment until, well, who knows?

As for operating expenses, somehow the project is making revenue estimates, but they haven’t even set the fare schedule. How do you do that? But even assuming (do you see that word a lot here?) their revenue and ridership projections are accurate, there is an inherent, unavoidable, inevitable huge annual cash subsidy. This is not unusual. This is the norm, but could someone in Hartford admit that?

So here’s the rub. Even more than I love railroads, I love the truth. The unvarnished, straight up, tell-it-like-it-is, we can take it truth. And we aren’t getting it. We are being fed pretty pictures, fantastic blue-sky fuzzy numbers and gauzy descriptions of an idyllic life in a future northeastern U.S. economy that seems farther from reality every single day.

If these words seem harsh, they spring from disappointment.

Disappointment that this project is not a practical, financially sensible fit for the market in which it is to operate, and disappointed that you and I are, yet again, being treated like proverbial mushrooms: kept in the dark and covered with . . . well, you know what I’m saying.

Sunday, June 20, 2010

FROM WALLINGFORD - Ready for that commuter train

As published in the Record Journal – Sunday June 20, 2010

Last week I needed to travel to Florida for business and I was flying out of JFK. I tend to take flights from New York because I can get the direct flights I need without needing to stop for layovers and connecting flights and so forth.

Generally this means that I have to burn up about eight gallons of gas round trip, pay the tolls on the way and then there’s the cost of long term parking that just went up 20 percent (per day).

The travelling costs for a trip like this (gas, tolls, parking for seven days) is generally about $165.

So for this last trip I decided to try something different.

I got a ride to Union Station in New Haven and I took Metro North to Grand Central in Manhattan. From there I walked a few blocks to the subway and I took it to Jamaica Station. At Jamaica Station I grabbed the AirTrain directly to JFK.

I did the exact opposite for my trip home as well.

The cost for the train ticket to Grand Central was $38.50 round trip and the cost of the subway round trip was $15.00. My total savings was $110.00. If you want to cut $10 for my father’s fuel to Union Station in New Haven you’re still talking about a savings of $100.00.

Now this trip did take me an extra two hours of time each way to allow for train and subway schedules and travel time but the time was my own.

I wasn’t driving my car; I was free to read the paper or work on my laptop or even nap a bit (and I did all three).

Actually on the way down my original departing flight was cancelled so from the train I rebooked my flight. I could have done that from the car while driving but it would have been difficult to do safely. From a passenger seat of the train it went about as simply as possible.

Now if I was travelling with my wife and the kids or with a lot of bags this would obviously not make sense to do and it would actually cost more.

When you consider all of the single commuters out there you can see where the savings are. Not just in personal dollars but in costs from the consumption of fossil fuel and other costs of a single commuter on already overcrowded roads.

The only missing piece to this puzzle is getting from Wallingford to New Haven.

Amtrak only has six to eight trains (depending on the day) that travel the line — half before noon and the other half after. They are long travel passenger trains that generally are not well suited to be used for commuting.

The plan to bring a New Haven to Springfield commuter line is way overdue. There are New Canaan and Waterbury lines that serve the western side of the state in a north/south fashion and then there’s the Shoreline East that serves from the Old Saybrook area westward into New Haven.

There’s a big gap in the coverage of commuters along the I-91 corridor. Something that the New Haven to Springfield commuter line will resolve.

I am going to be headed to a Yankees/ Mets game on Saturday and I am going to take Metro North but I’ll have to park in the Union Station garage. This is a far better solution than driving into the city and try to park but it would be so nice to hop a train in Wallingford and change for the Yankee Clipper in New Haven.

This solution might be a few years away yet but I am one commuter that is looking forward to the arrival.